Are O-Train service problems to be expected after the major upgrade, or are they unacceptable?
$60 million is a lot of money and it should buy a system that works in the first week. The problems are not acceptable.
They're ironing out the kinks and it's to be expected after such a major change to the system.
Vote
View Results
See this poll on:
https://poll.fm/8696681/embed